Thermal power capacity addition slows 32% in FY25 due to project execution problems

Hi
By -
0 minute read
0
Thermal power capacity addition in India decreased by 32% in FY25, with only 3.9 GW installed by February. The slowdown is linked to project execution issues, even as the country aims to increase coal-based capacity to meet rising energy demands.

from mint - news https://ift.tt/I2NGDFX
via IFTTT

Post a Comment

0Comments

Post a Comment (0)